| Project |
Main Contractor |
Work Specification |
Our Value |
| Jahra Road & Jamal Abdul Nasser Street Projects |
Ohl&Razzani |
Precast Yard Structural and steel Fence – Fabrication and installation of Kirby fence |
49,000.000 KD |
| Pipe Fabrication Factory |
Blue Lane |
Steel Fencing & Factory- Fabrication and installation of Kirby fence |
20,000.000 KD |
| Workshop |
Five star |
Steel fabrication – Roof fabrication and installation |
35,000.000 KD |
| Workshop |
Atrim |
Steel fabrication- Roof fabrication and installation |
50,000.000 KD |
| Equipment supports |
Schlemberger |
Concrete works-Foundation casting for heavy equipment |
6000.000 KD |
| Jahra Road & Jamal Abdul Nasser Street Projects |
Ohl&Razzani |
Precast Yard Structural and steel Fence – Fabrication and installation of Kirby fence |
49,000.000 KD |
| Pipe Fabrication Factory |
Blue Lane |
Steel Fencing & Factory- Fabrication and installation of Kirby fence |
20,000.000 KD |
| Workshop |
Five star |
Steel fabrication – Roof fabrication and installation |
35,000.000 KD |
| Workshop |
Atrim |
Steel fabrication- Roof fabrication and installation |
50,000.000 KD |
| Equipment supports |
Schlemberger |
Concrete works-Foundation casting for heavy equipment |
6000.000 KD |
| Burj Al Ras |
Burj Al Ras |
Polyurethane epoxy flooring |
25000.000 KD |
| GC-30 KOC |
NBTC |
Precast works for pipe supports for flow lines |
15,250.000 KD |
| KOC Rig 980 Camp |
SINOPEC |
Camp Maintanence |
15,000.000 KD |
| RA-256 |
AFCONS infrastructure |
Concrete works – Precast Gulley, manhole, Pile cap. Rebar works – Bridge segments |
35,000.000 KD |
| RA-263 |
Combined group |
Concrete works-Manholes, Water box culvert, Water proofing jobs, Electrical box culvert |
49,000.000 KD |
| RA-263 |
FCCI |
Concrete works- Communication manholes |
10,000.000 KD |
| Construction of V- Ditches- KIPIC NRP Projects |
UGCC |
Casting of RCC V-Ditches |
15000.000 KD |
| KOC |
NBTC |
Plant room, core store- rhenocol water based epoxy |
32000.000 KD |
| Sabah al salem university |
Sinohydro Corporation |
Earth Work Excavation and back filling and Compaction |
59,500.000 KD |
| Substation KOC, Abdaly |
Transatlantic/Bader Al Mulla |
Water proofing system |
36860.000kd |
| Al Saba Maternity Hospital Car Parking |
Pizzarotti |
Construction of new parking with markings, Storm water line works |
50,000.000 KD |
| KOC Anger160 Store |
TransAtlantic |
Epoxy & Floor Finishing |
13,500.000 KD |
| Roads connecting MinaAbdulla Port & Wafra |
Mushrif Trading & Contracting |
Sand Blasting of Steel Reinforcement |
13,608.000 KD |
| Air Defense Improvement Projects (For US Army) |
Al Yousifi |
Concrete works for different structures |
56,000.000 KD |
| Cargo City |
Pizzarotti |
Construction of new parking with road markings, Only Road markings for old parking |
10,000.000 KD |
| KOC-Type B site office |
Finesco |
Site office construction |
9000.000 KD |
| LFHOD- KOC |
TransAtlantic |
Pipe sleepers concrete works |
11000.000 KD |
| 360 Mall |
Trans Atlantic |
Plant room-epoxy flooring |
15000.000 KD |
| Adan Hospital |
SHBC |
Block Works |
5000.000 KD |
| OHL – Doha Yard |
OHL – RIZZANI |
Kirby fence relocation |
12000.000 KD |
| LFHOD – KOC |
TransAtlantic |
Precast Foundations |
16000.000 KD |
| IEPC – Machine Foundation |
IEPC |
Casting of Machine Foundations |
5000.000 KD |
| Al Saba Maternity Hospital –Temporary Roads |
Pizzarotti |
Earthworks, Preparation of Subbase, Asphalt Works and Kerbstone works |
24000.000 KD |
| Ahmed Al Jaber Airbase |
Kay & Associates |
Maintenance and Service for HVAC Package units (2 Nos) |
1000 KD |
| Kuwait Cargo City |
US AirForce |
Fabrication, Supply and Installation of Drop Arm |
3200.000 KD |